COMPLETE PROJECTS

Complete Project Details

NO PROJECT  CONTRACT AMOUNT COMENCEMENT DATE COMPLETION DATE ACTUAL COMPLETION DATE  ACTUAL CONTRACT AMOUNT STATUS
1 MATERIAL SUPPLY TO BAGATHULUWA UNIT AT GINIGATHHENA       2,097,492.25 23-Mar-12 23-May-12 COMPLETED
2 MATERIAL SUPPLY TO KOTHMALE UNI       1,546,005.38 23-Mar-12 23-May-12 COMPLETED
3 MATERIAL SUPPLY TO RAGALA OFFICE YARD       2,034,000.00 19-Mar-12 19-May-12 COMPLETED
4 IMP. OF ANKUMBURA IHALAMULLA ROAD     10,697,540.00 29-Mar-12 29-Jul-12 COMPLETED
5 IMP. OF ALUGAMA DEEGAHAWATHURA ROAD     10,203,680.38 29-Mar-12 29-Jul-12 COMPLETED
6 BOQ FOR QUATAION OF SUPPLIERS BOTANICAL GARDEN PERADENIYA       2,209,900.00 27-Aug-12 27-Oct-12 COMPLETED
7 CONSTRUCTION OF BRIDGE OVER MAHAOYA DEWAHANDIYA     12,157,885.00 28-Sep-12 28-Jun-13 28-Aug-14      7,862,954.09 COMPLETED
8 IMP. OF ALGIN MERAYA ROAD       4,984,220.00 8-Oct-12 8-Feb-13 COMPLETED
9 REHABILITATION OF KALUNTHANNA THAMMATIYANA DEVAHANDIYA ROAD (3.700-5.550KM)     20,668,930.00 5-Feb-13 23-Aug-13 12-Nov-13    19,879,224.38 COMPLETED
10 REHABILITATION OF WALGAMPAYA DOLUWA WAHARAKGODA ROAD     24,077,205.00 5-Feb-13 3-Nov-13 18-Nov-13    24,562,228.40 COMPLETED
11 IMP. OF AMBAGASTHENNA GURUBEBILA TEMPLE ROAD (0.000-2.280KM)       8,910,310.00 28-Mar-13 28-Jun-13 2-Dec-13      8,427,081.32 COMPLETED
12 IMP. OF KOSWATTAGAMA ROAD       6,210,856.00 28-Mar-13 28-Jun-13 COMPLETED
13 IM. OF MEEPILIMANA COLONY ROAD (0.000-1.175KM)       5,937,115.00 28-Mar-13 28-Jun-13 COMPLETED
14 IMP. OF THIBORTON MURUTHTHENNA HAGARAPITIYA ROAD     11,010,745.00 28-Mar-13 28-Jul-13 COMPLETED
15 SUPPLYING OF MATERIAL TO GELIOYA COCRETE YARD       1,055,600.00 2-Apr-13 2-Aug-13 COMPLETED
16 SUP. OF MATERIAL FOR MAINTENACE WORK TO BAGATHULUWA & KUMBALOLUWA UNIT       3,030,250.00 2-Apr-13 2-Aug-13 COMPLETED
17 SUP. OF MATERIAL FOR MAINTENACE WORK TO HIDDAULA YARD       4,708,000.00 2-Apr-13 2-Sep-13 COMPLETED
18 IMP. OF PORCELIAN FACTORY TO BABILAWILA TEMPLE ROAD       1,632,530.00 8-Jul-13 7-Sep-13 COMPLETED
19 RAGALA SMAGIPURA CONCRETE ROAD           776,650.00 15-Jul-13 30-Aug-13 COMPLETED
20 NUWARAELIYA GAMMADDA ROAD           808,085.00 15-Jul-13 30-Aug-13 COMPLETED
21 MADULLA KANDEYAYA CONCRETE ROAD           818,550.00 15-Jul-13 30-Aug-13 COMPLETED
22 TALWAKELLE COOMWOOD ESTATE           425,732.00 15-Jul-13 30-Aug-13 COMPLETED
23 SPECIAL ROAD MAINTENANCE OF DERANEGAMA ROAD       1,197,300.00 15-Jul-13 15-Sep-13 COMPLETED
24 SPECIAL ROAD MAINTENANCE OF GALABADAWATTA ROAD           839,334.55 15-Jul-13 30-Aug-13 COMPLETED
25 IMP. OF PORCELIAN FACTORY TO BABILAWILA TEMPLE ROAD       4,979,370.15 2-Sep-13 2-Nov-13 COMPLETED
26 IMP. OF GALHINNAWATTA HOUSING SCHEME INTERNED ROADS AT ARUPPOLA       8,326,467.15 17-Sep-13 17-Nov-13 COMPLETED
27 IMP. OF KALUNTHENNA MAHAWELA WERAGANTHOTA ROAD       1,264,321.00 7-Oct-13 22-Nov-13 COMPLETED
28 REHABILITATION OF INGURUOYA ROAD (0.00-1.00KM)     14,866,450.00 7-Oct-13 31-Dec-13 30-Dec-13    14,349,232.07 COMPLETED
29 REPAIRING TO PADIYAPALLALLA ELAMULLA ROAD BRIDGE, HAND RAIL 2/1,4/3,7/2, ELAMULLA           424,725.30 11-Aug-14 15-Aug-14 COMPLETED
30 IMP. OF TELISSAGALA HARANGALA TEA FACTORY ROAD (0.000-0.00KM)           852,150.40 1-Oct-14 16-Nov-14 COMPLETED
31 IMP. OF KOTAGEPITIYA SOUTH ROAD (0+000-1+000KM)           830,782.11 1-Oct-14 16-Nov-14 COMPLETED
32 IMP. OF WARALLAPATHANA ROAD (0.000-0.300KM)           850,478.38 1-Oct-14 16-Nov-14 COMPLETED
33 IMP. OF RUWANPURA REWANSGIRIYA ROAD (0.000-0.300KM)           338,826.02 1-Oct-14 16-Nov-14 COMPLETED
34 IMP. OF THELLISSAGALA HARANGALA TEA FACTORY ROAD (0.300-0.640KM)           850,833.82 1-Oct-14 16-Nov-14 COMPLETED
35 IMP. OF KOTAGEPITIYA SOUTH ROAD (0+000-0+800KM)           820,738.69 1-Oct-14 16-Nov-14 COMPLETED
36 IMP. OF HARANGALA 01 GANKEWALA ROAD (0.000-0.500KM)           422,684.32 1-Oct-14 16-Nov-14 COMPLETED
37 IMP. OF NAWAKADADORA ROAD (0+000-0+325KM)           671,898.00 1-Oct-14 16-Nov-14 2-Dec-14          707,739.59 COMPLETED
38 IMP. OF NAWAMORAPE ROAD (0+000-0+750KM)           821,974.00 1-Oct-14 16-Nov-14 COMPLETED
39 IMP. OF TILKUTTY AGRASS ROAD (0+000-1+000KM)       2,153,621.00 5-Nov-14 20-Dec-14 COMPLETED
40 IMP. OF DANCINAN POODALUOYA ROAD (8+550-9+000KM)       2,972,051.30 5-Nov-14 20-Dec-14 COMPLETED
41 MATERIAL SUPPLY FOR E.E. OFFICE RIKILLAGASKAD           232,637.09 25-Mar-15 25-Mar-15 COMPLETED
42 MATERIAL SUPPLY RIKILLAGASKADA EE DIVISION – RIKILLAGASKADA YARD       1,832,300.00 18-Jun-15 15-Dec-15 COMPLETED
43 MATERIAL SUPPLY DIMBULA EE DIVISION KOTHMALE YARD       1,251,850.00 18-Jun-15 15-Dec-15 COMPLETED
44 MATERIAL SUPPLY RAGALA EE DIVISION – RAGALA YARD       2,860,700.00 18-Jun-15 15-Dec-15 COMPLETED
45 IMP. OF DANCINAN POODALUOYA ROAD (2+200-3+150KM)       4,652,020.00 13-Jul-15 9-Nov-15 12-Nov-15      4,851,508.50 COMPLETED
46 IMP. OF TILKUTREE AGRASS ROAD (1+000-2+700KM)       4,208,828.24 12-Aug-15 9-Nov-15 31-Dec-15 COMPLETED
47 OVERLAY OF AGRASS BOPATHTHALAWA ROAD (3+745-4+645KM)       4,160,829.00 12-Aug-15 9-Nov-15 31-Dec-16      4,437,125.00 COMPLETED
48 REPAIRING OF EE OFFICE BUILDING AT RAGALA       1,365,326.18 14-Oct-15 14-Dec-15 COMPLETED
49 CONSTRUCTION OF CULVERT & RETAINIGN WALL AT OLIPHANT SHANTHIPURA ROAD           779,828.50 12-Oct-15 12-Dec-15 COMPLETED
50 CONSTRUCTION OF RETAINING WALL AT OLIPHANT SHANTHIPURA ROAD       1,785,801.50 14-Oct-15 14-Dec-15 COMPLETED
51 OVERLAY OF SISTRICT AGRICULTURE TRAINING CENTER ENTERENCE ROAD (BORALANDA)       3,996,838.99 14-Oct-15 14-Dec-15 31-Dec-15      3,975,996.49 COMPLETED
52 HIRING MACHINERIES FOR MAINTENANCE WORKS AT N/ELIYA EXECUTIVE ENGINEERS DIVISION 2 CUBE TIPPER FOR RAMBODA UNIT       3,000,000.00 5-Nov-15 4-May-16 COMPLETED
53 MATERIAL SUPPLY FOR PREPAIRING PREMIX TO OTHER AT HIDDAULA YARD       1,390,976.61 30-Mar-16 30-May-16 COMPLETED
54 M/S OF DANCINAN POODALUOYA ROAD       1,141,150.00 20-Apr-16 20-Jun-16 COMPLETED
55 IMP. OF WANNIPOLA GIRAGAMA ROAD       5,757,665.00 2-May-16 2-Aug-16 COMPLETED
56 TENDER FOR SUPPLYING (6X9)” RUBLE FOR MAINTENANCE WORK AT RAMBODA UNIT EE DIVISION N/ELIYA           466,200.00 24-Feb-16 25-Feb-17 COMPLETED
57 RECTIFICATION & SAND SEALING ON GALAHA PUPURESSA-DELPITIYA ROAD (10+000-12+000km)       1,552,320.00 28-Mar-16 11-Jul-16 COMPLETED
58 SUPPLING SAND TO NAWALAPITIYA-DIMBULA ROAD (10.000-24.000)           871,500.00 18-Mar-16 17-May-16 COMPLETED
59 APPROCHED ROAD TO HARANGALA DAM CREST ROAD (0.000-3.820km)           777,000.00 18-Mar-16 17-May-16 COMPLETED
60 IMP. OF BATAGALLA BATUGODA DIWANAWATTA ROAD (0+300-3+200km)     11,357,090.00 9-May-16 9-Aug-16 COMPLETED
61 MATERIAL SUPPLY OF RIKILLAGASKADA YARD (EE DIVISION RIKILLAGASKADA)           898,200.00 9-May-16 9-Oct-16 COMPLETED
62 MARKING ROAD CENTER LINE AND EDGE LINE (EE KADUGANNAWA)       1,906,520.00 22-May-16 21-Jul-16 COMPLETED
63 SUPPLYING CHIPS TO HARANGALA UNIT FOR SAND SEALING WORK IN NOORWOOD EXECUTIVE E. DIV.       1,000,000.00 10-May-16 31-May-16 COMPLETED
64 IMP. OF DOLUWA GURUKELLE NILLAMBA ROAD (1+000-2+500km)       9,311,611.00 10-Jun-16 10-Sep-16 COMPLETED
65 ROAD MARKINGCENTER LINES, PEDESTRIAN CROSSING COMPLETED
66 M/S DANSINNAN POODALUOYA ROAD (0.000-0.850km)           438,621.75 18-Jul-16 18-Sep-16 COMPLETED
67 IMP. OF DANCINNAN POODALUOYA ROAD (8+000-10+000km)       7,085,290.00 27-Jul-16 27-Oct-16 COMPLETED
68 C/R/W/ & HAND SHOULDER AT OLIPHANT SHANTHIPURA ROAD (1/1, 2/3, 2/4)       1,949,360.00 27-Jul-16 27-Oct-16 COMPLETED
69 CON. OF R/W AT UDAPUSSELLAWA MADULLA ROAD (10+100km)           489,723.00 27-Jul-16 27-Oct-16 COMPLETED
70 CON. OF R/W DAMBAGOLLA PARAGAHAWEWA ROAD (0+800km)           499,511.00 27-Jul-16 27-Oct-16 COMPLETED
71 REPAIR OF EXECUTIVE ENGINEERS QUARTERS – RAGALA       1,052,618.20 27-Jul-16 27-Oct-16 COMPLETED
72 IMP. OF CE OFFICE AT NUWARA ELIYA       1,061,785.00 27-Jul-16 27-Oct-16 COMPLETED
73 IMP. OF HUNGANWELA ALUTHGAMA ROAD (1+205-2+330km)       7,446,265.00 27-Jul-16 27-Oct-16 COMPLETED
74 NEW CON. OF R/W AT DANCINNAN POODALUOYA ROAD (10/8 CULVERT)           584,375.00 27-Jul-16 27-Oct-16 COMPLETED
75 IMP. OF THIBERTON MURUNTHENNA HNGARAPITIYA ROAD (15+000-16+000,12+000-13+000,6+800-7+000km)       8,127,443.00 27-Jul-16 27-Oct-16 COMPLETED
76 IMP. OF UDAPUSSELLAWA MADULLA ROAD (4+000-5+300km)       5,778,650.00 9-May-16 9-Aug-16 COMPLETED
77 CON. OF GABIAN WALL AT BUILDING DEPT. CIRCUIT BUNGLOW, N/ELIYA (STAGE-02)       1,607,425.00 27-Dec-14 24-Jan-15 COMPLETED
78 REP. TO PADIYAPALALLA ELAMULLA ROAD BRIDGE, HAND RAIL BRIDGE NO 1/3-1/4, 2/1, 4/3,4/4, 7/2 ELAMULLA MANDARAMNUWARA GONAPITIYA ROAD BRIDGE HAND RAILS NO. 3/7, 4/10, 4/11.           424,725.30 11-Aug-14 15-Aug-14          437,158.53 COMPLETED
79 ROCK BLASTING & REMOVING ROAK FROM THE ROAD AT UDAPUSSELLAWA NILDANDAHINNA WATHUMULLA ROAD (19+939km)           715,605.40 24-Dec-14 31-Dec-14          777,433.70 COMPLETED
80 ROCK BLASTING & REMOVING ROCK FROM THE ROAD AT UDAPUSSALLAWA NILDANDHAHINNA WATHUMULLA ROAD IN BETWEEN 23/15, TO 23/16 CULVERT           373,831.00 5-Dec-14 12-Dec-14          391,463.59 COMPLETED
81 CON. OF 90’X25′ TREE STORIED BUILDING 2ND STAGE N/KOTH/NAYAPANA/MAHA VIDYALAYA       4,768,126.96 11-Aug-14 8-Dec-14 15-May-15 COMPLETED
82 IMP.OF DOLOSBAGE KANDAKADE ROAD (0+000-1+750km)       9,501,900.00 12-Aug-15 9-Nov-15 15-Dec-15 COMPLETED
83 IMP.Of HASALAKA HOSPITAL ROAD STAGE-i       5,063,390.00 19-Nov-15 31-Dec-15 COMPLETED
84 IMP.Of HASALAKA HOSPITAL ROAD STAGE-ii       7,125,423.00 19-Nov-15 31-Dec-15 COMPLETED
85 REHABIUTATION OF GAMPOLLA WATTA TO ADIYAKADAWATHA MUSLIM SCHOOL ROAD AT GAMPOLA (0+000- 1+500km)     39,486,770.88 13-Mar-14 12-Jun-14 30-Sep-14    22,492,470.73 COMPLETED
86 ABC & ASPHALT LAYING AT KUNDASALE POLICE HOSPITAL       3,330,075.76 11-Apr-16 21-Jul-16 4-Feb-16 COMPLETED
87 TENDER FOR HIRING MACHINERIES FOR MAINTANANCE WORKS AT NORWOOD EXCLUTIVE ENGINEER’S DIVIION- 2016’MOIOR GRADER (12) FOR NORWOOD EE’S DIVISION       3,000,000.00 1-Jul-16 30-Jun-17 COMPLETED
88 BACKHOE LOADER FOR NORWOOD WORK UNIT       3,000,000.00 1-Jul-16 30-Jun-17 COMPLETED
89 TENDER FOR HIRING MACHINERIES FOR MAINTANANCE WORKS AT HAGURANKETHA EXCLUTIVE ENGINEER’S DIVIION- 2016 BAODKHOE LOADER FOR RIKILLAGASKADA WORK UNIT       3,000,000.00 1-Jul-16 30-Jun-17 COMPLETED
90 TENDER FOR HIRING MACHINARES FOR MAINTANANCE WORKS AT NUWARAELIYA EXECUTIVE ENGINEER’S DIVISION-2016, MOTOR GRADER (12) FOR N/ELIYA EE’S DIVISION       3,000,000.00 1-Jul-16 30-Jun-17 COMPLETED
91 RECTIFICATION & SAND SEALING ON MASKELIYA UPCOI ROAD FROM  (0+000-2+000km)       2,453,000.00 9-May-14 7-Jun-14 27-Aug-14      2,453,000.00 COMPLETED
92 RECTIFICATION & SAND SEALING ON MASKELIYA UPCOI ROAD FROM  (0+000-2+000km)       2,583,020.00 9-May-14 7-Jun-14 10-Oct-14      2,583,020.00 COMPLETED
93 REHABILITATION OF IGURUOYA ROAD (0+000km-1+000km)     14,866,450.00 7-Oct-13 31-Dec-13 30-Dec-13    14,349,232.07 COMPLETED
94 REHABILITATION OF KALUNTHENNE TAMMITIYANA DEVAHANDIYA ROAD     20,668,930.00 5-Feb-13 23-Aug-15 12-Nov-13    19,879,224.38 COMPLETED
95 REHABILITATION OF WALGAMPAYA DOLUWA WAHARATHAGODA ROAD     24,077,205.00 5-Feb-13 3-Nov-13 18-Nov-13    24,562,228.40 COMPLETED
96 REHABILITATION OF GALAHINNAWATTA ROAD       9,556,873.50 17-Sep-13 26-Dec-13 26-Dec-13      9,309,096.30 COMPLETED
97 REHABILITATION OF ALUTHGAMA WALAPALAGOLLA ROAD     21,604,690.00 5-Feb-13 8-Oct-13 14-Jan-14    21,249,816.39 COMPLETED
98 REHABILITATION / IMP. OF 181kM OF RUAL ROAD IN NUWARAELIYA DISTRICT COMPLETED
99 CONSTRUCITION OF BRIDGE NO FS 51 (CBUK 1256)PULLIYAR KOVIL BRIDGE IN NUWARAELIYA DISTRICT       4,909,915.48 COMPLETED
100 CONSTRUCITION OF BRIDGE NO FS 53 (CBUK 1259)KILARNEY BRIDGE IN NUWARAELIYA DISTRICT       4,064,087.76 COMPLETED
101 ROAD MARKING ON PELMADULLA EXEUTIVE ENGINEER DIVISION       1,583,642.50 COMPLETED
103 SUPPLY SAND TO NORWOOD- BOGAWANTHALAWA-CAMPION ROAD (1.000km-3.000km) & MASKELIYA UNIT FOR SAND SEALING WORK IN NORWOOD EXECUTIVE ENGINEER’S DIVISION           699,300.00 27-Jul-16 10-Aug-16 COMPLETED
104 SUPPLY SAND TO NORWOOD- BOGAWANTHALAWA-CAMPION ROAD (1.000km-3.000km) & MASKELIYA UNIT FOR SAND SEALING WORK IN NORWOOD EXECUTIVE ENGINEER’S DIVISION           704,850.00 27-Jul-16 10-Aug-16 COMPLETED
105 IMP.OF HANTHANA MAHASEN MAWATHA           856,025.00 8-Aug-16 30-Sep-16 COMPLETED
106 TENDER FOR SUPPLYING THERMOPLASTIC PAINT MATERIAL WHITE AT NORWOOD EXECTIVE ENGINEER’S OFFICE DIVISION AVISSAWELLA-HATTON-NUWARAELIYA ROAD (44.00-48.00km)           799,299.90 10-Aug-16 11-Dec-16 COMPLETED
107 ROAD MARKING ON PELMADULLA EXEUTIVE ENGINEER DIVISION       1,583,642.50 22-Aug-16 6-Jan-17 COMPLETED
108 ROAD MARKING ON COLOMBO RATHNAPURA-WELLAWAYA-BATTILALOA ROAD (99/105)       2,345,026.20 22-Aug-16 6-Jan-17 COMPLETED
109 TENDER FOR SUPPLYING & PILLING MATERIALS FOR RAOD MAINTANANCE WORK AT NOR WOOD EXECUTIVE ENGINEER’S DIVISION       2,167,750.00 1-Jul-16 30-Jun-17 COMPLETED
110 TENDER FOR SUPPLYING & PILLING MATERIALS FOR RAOD MAINTANANCE WORK AT NOR WOOD EXECUTIVE ENGINEER’S DIVISION-2016, SAND FOR MASKELIYA & NORTON WORK UNIT       1,679,575.00 1-Jul-16 30-Jun-17 COMPLETED
111 TENDER FOR SUPPLYING & PILLING MATERIALS FOR RAOD MAINTANANCE WORK AT NOR WOOD EXECUTIVE ENGINEER’S DIVISION-2016, SUPPLY CHIP FOR NORWOOD KOTAGALLA AND NORTON WORK UNIT       2,346,000.00 1-Jul-16 30-Jun-17 COMPLETED
112 TENDER FOR SUPPLYING & PILLING MATERIALS FOR RAOD MAINTANANCE WORK AT NOR WOOD EXECUTIVE ENGINEER’S DIVISION-2016, SUPPLY RUBBIES FOR NORWOOD KOTAGALLA AND NORTON WORK UNIT           479,051.15 1-Jul-16 30-Jun-17 COMPLETED
113 TENDER FOR THERMOPLASTIC PAINT MATERIAL YELLOW & GLASS BEADS AT NORWOOD EXECUTIVE ENGINEER’S OFFICE DIVISION           667,831.50 10-Aug-16 11-Dec-16 COMPLETED
114 TENDER FOR THERMOPLASTIC PAINT MATERIAL WHITE &  AT NORWOOD EXECUTIVE ENGINEER’S OFFICE DIVISION AVISSAWELLA-HATTON-NUWARA-ELIYA ROAD (41.200-44.00km)           759,439.80 10-Aug-16 11-Dec-16 COMPLETED
115 TENDER FOR THERMOPLASTIC PAINT MATERIAL WHITE & AT NORWOOD EXECUTIVE ENGINEER’S OFFICE DIVISION AVISSAWELLA-HATTON-NUWARA-ELIYA ROAD (63.00-67.00km)           799,299.90 10-Aug-16 11-Dec-16 COMPLETED
116 IMP.OF ASPHALT LAYING AT KADUGANNAWA RURAL HOSPITAL ROAD       4,631,400.00 29-Aug-16 12-Sep-16 COMPLETED
117 CONSTRUCTION OF 50’x25′ TWO STORIED BUILDING GROUND FLOOR BALANCE WORK & 1st FLOOR AT CP/N/DHARMAPALA VIDYALAYA       7,970,709.90 13-Sep-16 10-Apr-17 COMPLETED
118 TENDER FOR HIRING BITUMAN SPRAY BOWSER FOR SAND SEALING WORK IN NORWOOD EE’S OFFICE DIVISION       1,000,000.00 27-Jul-16 28-Jan-17 COMPLETED
119 TENDER FOR APPLYING THERMOPLASTIC PAINT MATERIAL YELLOW FOR PEDESTRIAN CROSSING & APPLYING THERMOPLASTIC PAINT MATERIAL WHITE FOR EDGE LINE, CENTER LINE AT NORWOOD EE’S OFFICE DIVISION       1,000,000.00 10-Aug-16 11-Dec-16 COMPLETED
124 IMPROVEMENT OF PREMARATHANA MAWATHA (2+000 – 2+800 KM)       3,806,980.00 14-Oct-16 14-Dec-16 COMPLETED
125 IMPROVEMENT OF DICKOYA FORDYCE GAP ROAD (0+500 – 1+570 KM)       2,974,380.00 14-Oct-16 14-Dec-16 COMPLETED
127 IMPROVEMENT OF PADUPOLA MADILLA THINIYAGALA ROAD (1+010 – 1+400 KM)       1,789,860.00 14-Oct-16 29-Nov-16 COMPLETED
128 IMPROVEMENT OF ACCESS ROAD AT DIGANA SPORT COMPLEX (0+000 – 0+225 KM)       9,990,064.35 13-Oct-16 13-Nov-16 COMPLETED
129 IMPROVEMENT OF MORAGAHAMULLA NEAR BRIDGE TO MADAMAHANUWARA LINK ROAD (0+000 – 0+700 KM)       2,975,534.00 COMPLETED
130 IMPROVEMENT OF ROAD NEAR DIGANA PLAY GROUND       4,850,452.00 COMPLETED
136 TERNDER FOR HIRING MACHINERIES FOR WIDENING AND IMPROVEMENTS LINDULA END OF AGRASS ROAD (20+000 – 21+400 KM) NUWARA ELIYA EXECUTIVE ENGINEER’S DIVISION, WATER BOWSER 2016       3,000,000.00 11-Aug-16 10-Aug-17 COMPLETED
137 TENDER FOR HIRING MACHINERIES FOR WIDENING AND IMPROVEMENT LINDULA END OF AGRASS ROAD (20+000 – 21+400 KM) NUWARA ELIYA EXECUTIVE ENGINEER’S DIVISION, 10 TON ROLLER – 2016       3,000,000.00 11-Aug-16 10-Aug-17 COMPLETED
138 TENDER FOR HIRING MACHINERIES FOR WIDENING AND IMPROVEMENT WORKS LINDULA END OF AGRASS ROAD AT NUWARA ELIYA EXECUTIVE ENGINEER’S DIVISION, ASPHALT TRANSPORT (20+000 – 21+400 KM) – 2016       5,000,000.00 11-Aug-16 10-Aug-16 COMPLETED
139 APPLYING THERMOPLASTIC PAINT MATERIAL FOR PEDESTRIAN CROSSING, EDGE LINES & CENTER LINES IN NUWARA ELIYA EE’S DIVISION – 2016           864,934.20 22-Sep-16 21-Sep-17 COMPLETED
140 ROAD MARKING KUNDASALE EE’S DIVISION COMPLETED
142 CONSTRUCTION OF CULVERT AT UDAPUSSALLAWA MADULLA ROAD (5/6 CULVERT)       1,044,228.66 20-Oct-16 5-Dec-16 COMPLETED
143 NEW CONSTRUCTION OF RETAINING WALL AT THIBERTON MURUTHENNA HANGARAPITIYA ROAD (17/1 CULVERT)       1,907,052.80 20-Oct-16 5-Dec-16 COMPLETED
144 TENDER FOR HIRING MACHINERIES FOR MAINTENANCE WORKS AT NORWOOD EXECUTIVE ENGINEER’S DIVISION-2016, BACKHOE LOADER FOR NORWOOD WORKS UNIT       3,000,000.00 1-Sep-16 30-Jun-17 COMPLETED
145 TENDER FOR HIRING MACHINERIES FOR MAINTENANCE WORKS AT HANGURANKETHA EXECUTIVE ENGIINEER’S DIVISION-2016, BACKHOE LOADER FOR RIKILLAGASKADA WORKS UNIT       3,000,000.00 1-Sep-16 30-Jun-17 COMPLETED
146 TENDER FOR HIRING MACHINERIES FOR MAINTENANCE WORKS AT NUWARA ELIYA EXECUTIVE ENGINEER’S DIVISION – 2016, MOTOR GRADER (12)       3,000,000.00 1-Jul-16 30-Jun-17 COMPLETED
147 LAYING ASPHALT OF DIGANA VILLAGE JUNCTION TO “LIN THUNE” ROAD AT DIGANA FROM 0+200-0+900 KM     12,669,335.00 7-Dec-16 31-Dec-16 31-Dec-16 COMPLETED
156 CONSTRUCTION OF ASPHALTING CONCRETE IN BUS STAND RIKILLAGASKADA       3,298,665.00 10-Nov-16 10-Dec-16 17-Dec-16      3,286,886.89 COMPLETED
157 ROAD MARKING IN KADUGANNAWA EE’S DIVISION       1,729,528.74 COMPLETED
159 ROAD MARKING IN KADUGANNAWA EE’S DIVISION           479,222.50 COMPLETED
161 METALLING AND TARRING ON PROTOFF DELTA ROAD (3+000-3+600KM)       2,722,706.19 11-Nov-16 31-Dec-16 COMPLETED
163 ASPHALT CONCRETING OF APPROACH ROAD OF KENGALLA MAHA VIDYALAYA UP TO THE PLAYGROUND (0+000-0+285 KM)       3,897,773.07 10-Jan-17 19-Jan-17 COMPLETED
Head Office

No 1/73 , George E De Silva Mawatha
Kandy

Tel / Fax : 081 2232535
Hotline : 0777 801734

Branch Office :
C60, Dedicated Economic Centre, Udapussellawa, Road, Nuwara Eliya

Tele : (+94) 522234571

Email : grnkandy@gmail.com